Architect – Winford Lindsay Architect

General Contractor – JE Dunn

Building Owner – North Point Hospitality Group, Inc.

John W. McDougall Company installed 3” tube steel frames, fabricated by Elite Welding in Lebanon, TN, in the North and West 2nd, 3rd, 4th and 5th floor parking levels façade openings of the hotel.  1/8” thick aluminum perforated panels, prepared by Erdle Perforating of Rochester, NY, were then placed against the inside of the steel frames.  Both the frames and perforated panels were painted by Superior Sandblasting and Powder Coating of Nashville, TN with the Drylac TIGER Bengal Silver product.  Anodic Clear aluminum composite panel slab Edge covers were then fabricated and installed by John W. McDougall Co. in Nashville, TN for the 2nd, 3rd, 4th & 5th floor parking garage.  Morin brand N-12-0 horizontal painted single skin aluminum panels in Dove Gray were selected for the roof screen wall.  Aluminum flashings provided by Pac-Clad of Atlanta, GA painted Bone White and Sierra Beige at the 6th floor slab edge will be installed under the handrail and finish the transition between the tile floor, the EIFS and the bricks.  Completion date set for summer 2018.